Skip to main content

Other People's Build Blogs

Other build blogs I follow:


http://wembley35.blogspot.com.au/ : MummaDJ also has a huge alfresco just like ours. Good to read that the alfresco is one of the things she loves.


http://waldorf44oakleigh.blogspot.com.au/ : Jack & Michelle are also doing the Chatsworth facade!

http://bendigowaldorf.blogspot.com.au/ : Brenton probably has the hugest block of land Porter Davis has even worked on meaning their Govt & OHS is like $100 compared to my $20k! Not fair!


http://waldorf46boston.blogspot.com.au/ : I like what Phil has done to the extended terrace / balcony!


http://waldorf44ma.blogspot.com.au/ : A very lovely stirling facade with a nice backyard pool to match!


http://sandringham45.blogspot.com.au/: The widest garage I have ever seen

http://projecthouse2012.blogspot.com.au/: I can not believe these guys' brickwork was so bad, they had to rip it all up and rebrick the 3 sides of the house.


Update: New blogs that have started their builds after mine



Update 07/12/2014:

Cam and Kisten built with Metricon. Now that I'm closer to finishing, I'm reading up on their landscaping story...




Comments

  1. Hi Jerry,

    I posted way back in November on this blog, lots of helpful information as I have now put a deposit down on the Marriott 48 (modified for us though). Just curious, it has been about three weeks now since we signed off on our quote and our file was submitted for processing, how long did it take from that point in your process, until tender and colour selections? Might be a bit delayed for us since we had some significant alterations to the floor plan for them to process, I would have thought we'd get a BC by now though.

    ReplyDelete
    Replies
    1. Hi Danny, Our BC called us within 2 weeks and the Engineering company called us to book the soil test in shortly afterwards. If you are in the East, I've been told there's been an influx of work come in so they are taking forever to revise my contract. If you're concerned, I suggest talking to your SC and have her chase it up for you.

      Delete
    2. Also we had a two month gap between our Sales and Tender but there was a Christmas break in between. Colours, Electrical, and Tiles, and Contract is 'normally' within one month after Tender.

      Delete
  2. Thanks Jerry, yes we are chasing up with our SC, however he has only advised that the file is with the office and they are working on it. We are in the East, however our site start is set for June, hopefully things start moving quickly.

    ReplyDelete
  3. Was contacted by BC yesterday and got tender and contract appointment dates, hope everything is progressing with your contract too.

    ReplyDelete
    Replies
    1. That's great to hear. It's in their best interest to get you moving since they're not making money out of you until you put down the Tender money. Remember, you can request for a copy of the Soil Report to be sent to you as well since that is what your initial $1000 pays for.

      Delete
  4. your blog is so helpful and really GREAT. Thanks for sharing all of these with us. much appreciated!

    ReplyDelete
  5. Being safe around your swimming pool with some frameless glass pool fencing installed will surely give you a peace of mind especially having small children playing around it!

    ReplyDelete

Post a Comment

Popular posts from this blog

Interior Paint - Wattyl Winter Mushroom

Painting is complete. We've gone for the grey finish to the walls. Here's how the Winter Mushroom looks. Originally we thought of doing white for the architraves and doors but got convinced by the colour consultant to use the same paint all round. Was a bit worried at first but it has come off nicely. 

Austral Hawthorn Bricks

Here's some photos of our Hawthorn bricks. These were category 4 upgrade and costs ~$5k. The off white mortar was another $1k on top. We chose to have the rolled joints instead of a flush finish. I think the off white mortar together with the rolled joints make the bricks stand out better and have been well worth the money.

External Elevation Drawings

These are the elevation drawings on how our house will look like. Wish they did a 3D model but this will suffice. This is our version of the Chatsworth facade. Notice the archway has been straightened to be more contemporary looking. One of our windows needs to be obscured. We've selected SatinLite finish instead of Spotswood glazing. The top of the balcony should be brick too so I've asked them to update it as a Post Contract Variation (even though I've picked it up before contract signing).  There's our extra laundry window and extended alfresco at the back Alfresco spanning the width of the house. Extra roller door to the back of the garage so we can drive straight through.  There's the big 3.6m feature window.  The maximum height they could do was 1.5m which is why it looks so short. Slight fall to the block so our house is cut in a bit more than we like it but that's how it's going to be done. At least we've increased the he...