For our electrical appointment, I was spaced out like a zombie having worked to the wee hours of the morning with little sleep in between. Luckily the electrical selections were pretty straight forward and basically we could have just left it to the consultant to plot all the locations of the LED downlights and power points. You'd think it would be much less time consuming if they had done that to begin with. Have a base plan and a fully upgraded plan that people can just choose and be in & out in 15 mins. Here is the layout: Ground Floor: Upper Floor: For our kitchen island, instead of having the power points on the essa stone, we're getting them tucked inside a cabinet door like this we can not get these: For the pullout bin, we wanted to put in the blum servo drive uno to auto open / close can not get these even though they are from the same supplier (blum ) For the LED lights, they are hardwired Telbix 301 LED GU 10 Downlights wi...
Marriot 48 with Chatworth Facade