Post Contract Variations

Since contract signing, these are the extra post contract variations that I've had to sign off on...  Variation 15th May At the time of receiving this first variation I was pretty darn frustrated. Site start was meant to be in May and here we are middle of May and they've only just done the corrections to the contract. Remember, my original site start was in MARCH! The changes were: Corrected 200mm wide wireware 2 tier slide out drawer with blumsoft closer. I was originally quoted $635 but this revised it down to $383 ($231 for the drawer and $152 for the soft closer) Corrected drawings to show floorboards under shelving in store room Corrected plaster void from 100mm to 1000mm from floor level in master retreat Remove Hallway doors - saved $1500! Updated tiling price to base off revised floorplan - saved $1000 Upgrade to HX35i - Got charged $1210 for this one even though I had this in my original contract at $800ish. Not happy.  Update heating zone 1 to grou...

Porter Davis & HIA Contract Signed!

Our contract was finally signed off on 21st March. On the day of our Contract, we arrived too early.. 9am sharp as all our other appointments had been scheduled for the morning. Unfortunately, I didn't check this one and it was actually meant to be 12pm. The contract wasn't ready to present to us yet (which meant they were still busy putting it together last minute), and we had to drive home, wait a bit, and drive back for the 12pm appointment. Upon going through our Contract document, we noticed a few mistakes here and there that needed to be fixed and also needed to reduce some of the upgrades as we found ourselves $20k over our budget. Due to problems with the computers and a shortage of staff (possibly because some people would just be coming back from Christmas / New Year breaks), we found ourselves waiting for our revised contract up until 6.30pm. Now, being mindful of the fact that our BC also had a family and life outside of work, we agreed we would pay the 5% depos...