An old Brooklyn Chatsworth design?

Saw this Chatsworth facade the other day. Not sure what design this is as it is quite an 'old' house (Last sold in 2009). My guess is that this is a Brooklyn (?) or it could be a design that has been phased out.   The centre of the facade is a 3 panel awning and not a door like a Waldorf / Marriot. The front door is, instead, on the right (of this photo), next to the double garage. They have also added an extra garage so to the other side of the house - never knew you could do that!  This is a very wide house (on a 1000+ sqm block). The only house I can see from the Porter Davis site that this facade can match is the Brooklyn. I was able to find some old sale photos for the house but unfortunately it is missing the all important floorplan picture! The Kitchen:  One of the Master Bedrooms: Ensuite: Where is the soaker tub? Family Room:  No stairs in the hallway, so can't be a Waldorf / Marriot  Open living a...

Porter Davis & HIA Contract Signed!

Our contract was finally signed off on 21st March. On the day of our Contract, we arrived too early.. 9am sharp as all our other appointments had been scheduled for the morning. Unfortunately, I didn't check this one and it was actually meant to be 12pm. The contract wasn't ready to present to us yet (which meant they were still busy putting it together last minute), and we had to drive home, wait a bit, and drive back for the 12pm appointment. Upon going through our Contract document, we noticed a few mistakes here and there that needed to be fixed and also needed to reduce some of the upgrades as we found ourselves $20k over our budget. Due to problems with the computers and a shortage of staff (possibly because some people would just be coming back from Christmas / New Year breaks), we found ourselves waiting for our revised contract up until 6.30pm. Now, being mindful of the fact that our BC also had a family and life outside of work, we agreed we would pay the 5% depos...

$2.28 million Waldorf

You guys will love this one! Found what has to be pretty close to the most expensive Waldorf ever sold. $2.28 million sold July last year. Looks every bit the part! Stirling Facade You can't tell that much but there is a massive slope to this block. So much so, you can really only see the top floor from street level. The photographer did well masking that with this clever angle The back: Here you can get a better sense of how much slope there is here. Must be over 3m! I am surprised Porter Davis even built on this block. I originally thought having only 2/3rds of the back as a alfresco would look a bit odd but it actually looks okay. Notice they have enclosed the rear due to overlooking issues probably.  Alfresco:  Beautiful tiling Dining Room: With the enclosed rear option, there is meant to be a supporting pole in the middle of this room. I read on the forums that this pole / plumbing stack / whatever could not be avoided. How did these guy...

Graham Hooper vs Metricon - a win for all of us!

In breaking news today, Graham Hooper has won a law suit against Metricon for shoddy slab work. The payout $289,589.65 which covers "the demolition and reconstruction of the house and the loss of rental income". The house is in Tarneit. Source:  http://www.propertyobserver.com.au/finding/residential-investment/house-and-land/29806-metricon-ordered-to-pay-home-owner-faulty-build.html   " In 2006, as the home was being constructed, Hooper and surveyors found that the slab was built to an incorrect height. Rather than restarting construction, Metricon agreed to deduct $7,500 from the house price and import soil after completion to level the external landscape." According to the article, Metricon tried to claim the resulting issues as edge heave due to landscaping and 'excessive watering'. Luckily, independent engineers were brought in and concluded that Metricon was at fault for the slab movement. Woohoo to that! This is a landmark case. The first I...

Underground Electrical Pit

Our underground pit was installed a few weeks ago. It is only about 1.5 - 2m to the electricity pole in the corner of our block so came in 'relatively' cheaply ~$2k. We used Webb Excavations ( www.webbexcavations.com.au ). Apparently, if underground is too costly, you can also opt for overhead. From what I've read, Porter Davis will charge ~$1k for overhead setups. Obviously underground looks nicer and I assume it would be safer too (even for non-bushfire areas).  Here, you see the concrete has been cracked where they dug the trench. They've already organised for a concreter to come in a few weeks time to have it fixed. It's good to know they were on top of it. The process to get this done was actually a bit harder than I thought. Our electricity wholesaler doesn't have their own preferred installers and I was directed to a big long VEDN contractor registrer . There are 200+ contractors with different levels of certification. Civil Work Type 1. P...

Surrey Hills Waldorf

Continuing my fascination with other people's Waldorf's / Marriots... here's one that sold early 2013 (Marh or April) ... also with the Chatsworth fascade.. The fascade: The driveway: The backyard: They've enclosed the terrace, left the alfresco and added the extra family / rumpus rooms to the back. Looks a bit funny with the extension sticking out like that I think. Might work nicer to extend the roof out and join to make a grand alfresco. From the side: Look at the size of that big fixed window. According to the floorplan, this should be at least 3.6m wide and way more than 1.5m tall! This is definitive proof that Porter Davis can, and have installed bigger windows than mine before! For anyone else pre-tender, you can use this photo as backup if they also tell you they can not make 3.6m x 2.1m fixed one piece windows.  The balcony: Dining Room The Family Room: The Lounge: The Kitchen: The Home Theatre: The ...

Brivis Gas Ducted Heating and ICE refrigerated cooling add-on

The standard included ducted heating system (can't remember which model) is insufficient for a 48 square house. We've upgraded to the Brivis MX35i for ~$14k.  There's also the option to upgrade to the HX35i which is the high efficiency model for an extra $852. As we've max'd out our budget for the house, we've downgraded to just the MX35i but will probably ask them to put it back up to the HX model as it should pay itself off over the long run. (I tried to get some stats on how long it would take to pay off but couldn't find any useful comparisons. One forum poster said 30% more efficient and pays off in 1.5 years.. I'll be more conservative and say 3 years which is still pretty good return. Good for the budget and good for the environment) This is the add-on airconditioner. We've only ever had evaporative air conditioning in the past and there's no way I'm putting evaporative into a new house. It's fine when it is <30 ...